Government Contracts

Jim McGovern List of Consulting Engagements
for Federal and State Government Contracts

Representative Sample of Consulting Engagements
Involving Federal Contracts:

• RJ Lee Group, Inc.: Provided consultation regarding acceptable cost allocation methodologies and overhead pool structure in regards to operation of a laboratory at a GOCO facility.

• Bureau of Indian Affairs (BIA): Conducted forensic audit of the financial activity of the Tuba City Boarding School Project (Project), contract number CTN00T780K4.

• Anadarko Industries: Termination Settlement Proposal for Calibration and Metrology contract.

• AshBritt, Inc.: Provided consultation regarding allowable and recoverable costs, and setup of overhead pools pertaining to multi-million dollar hurricane cleanup contract.

• NAVAIR/ROI SHARP Dispute; contracts N00019-01-C-0105 and N00019-03-C-0028. Provided consultation regarding allowable and recoverable costs and assisted with analysis of cost impacts.

• RE: U.S. et al v. Northrop Grumman Corporation 89 C 6111: Engaged as consulting expert on government cost accounting issues relevant to qui tam defective pricing case.

• Aircraft Gear Corporation – numerous engagements. Provided consultation regarding allowable and recoverable costs, setup of overhead pools, and cost impacts. Also assisted with preparation of approximately two dozen termination settlement proposals.

• Target Corporation - numerous engagements. Provided consultation regarding setup of government contract compliant accounting system, allowable and recoverable costs, setup of overhead pools, and cost impacts. Also assisted with preparation of several dozen termination settlement proposals.

• Grace Analytical Lab – Provided consultation and assistance with set-up of government contract compliant cost accounting system. Also assisted with preparation of annual incurred costs proposals.

• Recon Optical CROWS – Providing independent analysis of cost impacts due to contract changes and schedule delays. Assisted with preparation of requests for equitable adjustment and $70M termination settlement proposal.

• Cessna Aircraft– assisted with analysis of cost impacts due to constructive changes to training aircraft contract.

• General Dynamics – assisted with preparation of settlement proposal for convenience termination and reviewed subcontractor settlement proposals.

• Eaton Corporation – several engagements involving analysis of cost impacts and consultation regarding cost allowability as well as assistance with preparation of termination settlement proposals and review of subcontractor settlement proposals.

• Siemens Building Technologies, Inc. – numerous engagements to provide analysis of cost impacts and consultation regarding cost allowability, overhead rate calculations, and other cost accounting issues. Projects included:

— Alaska Native Medical Center Replacement Hospital

— VA Medical Center - Replacement Hospital in Detroit, Michigan

— Federal Detention Center for the Department of the Federal Bureau of Prisons

— CDC Replacement Lab in Ft. Collins, CO

— NIH, Rocky Mountain Laboratories Integrated Research Facility

— United States Court House, Cadman Plaza, Brooklyn, NY Representative

Sample of Consulting Engagements Involving State and Local Government Contracts:

• New York State Department of Environmental Conservation; American Drive-In Cleaners Site- Provided analysis of support for cleanup costs being passed down from a government agency to a former land owner.

• Metropolitan Water Reclamation District; Professional Auditing Services of Construction Contracts - Metropolitan Biosolids Management, LLC – Chicago Biosolids Project – Provided analysis and review of support for costs incurred in the construction of a state of the art waste to energy facility.

• Metropolitan Water Reclamation District; Professional Auditing Services of Construction Contracts - SVS Tunnel at Stickney Emergency Work - Provided analysis and review of support for costs incurred in the construction of a service tunnel.

• Oglala Sioux Tribe; assessment of construction costs of the Prairie Wind Casino and Hotel projects. Provided analysis and review of support for costs incurred in the construction of a casino hotel in Pine Ridge, SD.

• Pueblo of Santa Ana; Review of SAHC Construction Project, Hyatt Resort. Provided analysis and review of support for costs incurred in the construction of a casino, hotel, and golf course near Albuquerque, NM.

• Aqua Service Management Co. v. Township of Lockport Utility Board and Township of Lockport – Provided independent assessment of losses caused by breach of contract.

• Globetrotters Engineering Corporation – Audit of Globetrotters Engineering Corporation's contracts with the State of Illinois for compliance with terms of agreement with the state.

• Siemens Building Technologies, Inc. – numerous engagements to provide analysis of cost impacts and consultation regarding cost allowability, overhead rate calculations, and other cost accounting issues. Projects included:

— The New Cook County Hospital

— JFK International Air Terminal

— Lincoln Tunnel - NJ Plaza Rehabilitation and Upgrade Project

— State of North Carolina SBI Crime Lab

— City & County of San Francisco – Jail # 3 Replacement

— Connecticut Juvenile Training School – Middletown, Connecticut

— Lower Buckeye Jail Central Services Facilities - Maricopa County, AZ